| Sprigs are spread by hand to ensure uniform coverage |
![]() |
| Once spread, they are cut in with this machine to ensure soil contact |
![]() |
| Finished product! Doesn't look like much, but will begin to root in and grow like crazy in a week or so |
The place to get a behind-the-scenes look at grounds maintenance at Bailey Ranch Golf Club
![]() |
| Sprigs are spread by hand to ensure uniform coverage |
![]() |
| Once spread, they are cut in with this machine to ensure soil contact |
![]() |
| Finished product! Doesn't look like much, but will begin to root in and grow like crazy in a week or so |
One of the goals of this greens renovation, besides expanding all the greens back to their original dimensions, is to take the opportunity to soften some slopes and flatten pinnable areas to make the greens more playable. One of the bigger adjustments we have planned is to increase the front pin area on #12. We are adding approximately 1,250 square feet to the front of the green which will substantially improve accessibility from approaching shots and make putting on this pin area much more feasible. As you can see in the picture above, Fleetwood is beginning to remove the soil and make the shape of the new front edge. Once the soil is removed, they will begin installing the necessary drainage pipe, gravel and greens mix to match the existing greens profile. Over the next few days, they will complete this work so the whole green can be rototilled and the rest of the process can continue as we get ready to spring these back nine greens sometime late next week. We are excited to complete this work and I'll be sure to post some pictures of this area once the final contours are set and we're ready for sprigs!
![]() |
| Greens expansion on front of #12 |
![]() |
| All treated turf was cut 1" deep |
![]() |
| Cut turf is removed to prepare sprigbed |
![]() |
| Tee boxes cut and stripped for new sod |
![]() |
| Bermuda contamination removed from inside edge of green |
![]() |
| Rototilled 8" deep 2 directions |
![]() |
| Final shaping complete and ready for sprigs! |
Thanks and see you out on the course!
As you play the golf course over the next few months, it will be hard to miss the red lines that have been drawn around the greens. These lines show the location of the original greens edges that were built back in 1992. Locating these edges is the first step of the greens renovation project that is kicking off during the summer of 2021! We are very excited for this project to get underway. Expanding the greens is only one of several goals we hope to accomplish with this project. The main goal of the renovation is to convert the old Bentgrass greens to TifEagle ultradwarf Bermudagrass. Bermudagrass will give us the ability to have firm, smooth, fast greens every summer regardless of the weather. Bailey Ranch was designed as a links golf course where firm, bouncy conditions create a focus on the ground game. Golfers don't often get the full intent of our design since our Bentgrass greens are slow and soft throughout the summer. Bentgrass can survive our summers, with lots of care, but doesn't allow us to create this desirable playing surface due to us focusing entirely on turf survivability. Bermuda greens will allow us to optimize our conditions to suit the demands of our members and guests throughout the golf season, when they are here. Often, our Bentgrass is best from fall through spring, when fewer customers can enjoy it.
Greens won't be the only improvements being made during this project. Irrigation upgrades and Par 3 tee box laser grading and sodding are planned as part of the project. The irrigation system as become increasingly unreliable and accuracy of our water applications has always been an issue. These upgrades will increase our control and accuracy of how we water which will, in turn, reduce our water usage and improve the overall health and playability of the golf course. The Par 3 tee boxes have become severally crowned over the decades from divots being taken and sand topdressing being applied. The tee tops have become so sloped that often I hear from golfers that they have trouble finding flat lies on the tee box. We are very excited to be able to address this issue while making these other improvements.
Hard to believe it's been a year since I last updated the blog regarding the bridge on #11. Although it may not seem like much has happened to the bridge, there is a reason the project was delayed. Last year, after I wrote the last post, the project went to bid and the bids that came in were over budget. Therefore, we rejected the bids and went back to the drawing board. Since this is such an invasive project and we would need to close the back nine while the bridge is out, it was determined that we'd need to wait to do the project during the off-season. Therefore, we planned to re advertise in fall and begin the work in December of 2020.
With this in mind, I'm happy to report that the bridge renovation on #11 is underway! On December 7th, the contractor began working on the project and has already made progress. Demolition of the west cart path approach and preparations for the west side bridge abutment have begun. Once the west side bridge abutment is finished, they will demolish the old bridge and begin building the abutment on the east side. After both abutments are finished, the new bridge will be lifted into place and the new cart paths will be poured on each side of the bridge. Lastly, any necessary grading and sod work will be done to finish off the project. Barring weather delays, the contractor expects to finish the project around the end of January.
We are really excited for this project to get finished and cannot wait to see the finished product when it's complete. As always, we understand this improvement project is disruptive to the golf experience and appreciate your continued patience while we complete this project! If you have any questions or comments, please feel free to contact the Grounds Department.
Thank you!
![]() |
| Sneak peek of the new bridge! Can't wait to see it in it's new home! |
I’ve
had many people ask me what’s going on with the bridge on #11 over the past few
months. It’s clear the condition of the
bridge has deteriorated over the past few years, and as you’ve noticed, we’ve
been using wood planks and steel plates to make it as smooth as possible while
we work on getting it replaced. Over
past few months, we have been working with public works on designing a new
bridge and are currently advertising for bids.
The plan is to award bids this week, begin construction in January and
have the bridge complete before the golf season begins. I’ll post more information once we get
further along in the process. Thank you
for your patience while we work to get this done.
Everyone get out their canoes and kayaks! Just about the only way you would be able to get around the golf course this morning after the rain we just had. In all seriousness, the weather in May can be unpredictable and recently we've had more than our share of storms. In the past 24 hours, we've had almost 8" of rain. May is historically the wettest month of the year, with just over 6" average rainfall, and we surpassed that mark in less than 24 hours! This is on top of the almost 5" of rain we've received thus far in May. To say it's been wet lately is a huge understatement.![]() |
| The tunnel ceiling is almost 10 feet tall. |
![]() |
| All contaminated sand with mud will have to be removed and replaced |
For those who read this blog regularly and have been looking for new posts, I apologize. I don't update this blog nearly as often as I should but am trying to continue to post content periodically throughout the year. Spring is always a busy time of year on the golf course, and this year is no exception. We have been working on wrapping up some last minute winter projects and preparing the course for the beginning of the new growing season.
One of the most important spring activities each year is spring greens aeration. This year, based on our annual soil testing, it was determined that we should aerate our greens twice. Not wanting to disrupt the golf calendar more than necessary, we decided to complete the two aerations back-to-back. This minimized the recovery time and greens were back to normal in 10-14 days. Almost two months have passed since we finished the aeration process and greens have been very healthy and smooth.
As a part of our yearlong cultivation plan, we decided to go out last week with another mini-tine aeration to continue to pull more organic matter from the putting surfaces. This aeration is non-invasive and greens never lost smoothness or speed during the process. Due to the aggressive nature of our aeration plan this year, we are already 80% toward our goal of displacing a minimum of 20% of the surface each growing season. This will set us up well for the stressful summer months, and will set us up to meet our goal of displacing almost 30% of the surface. Given the age of our greens, this aggressive goal will allow us to keep the greens healthy, firm and quick more often throughout the season.
National Golf Day, in Washington D.C., was on May 1st this year and for the first time, I was able to attend, on behalf of the Oklahoma Golf Course Superintendent Association. This was my first time attending National Golf Day and I was honored to be chosen to represent the OKGCSA in Washington D.C. The GCSAA and We Are Golf organize the entire event and have done a great job coordinating congressional meetings and volunteer activities around the Mall for over 200 superintendents from across the country. We completed needed landscape work around the memorials in the national Mall on Tuesday April 30th and then on Wednesday May 1st, we spread out at the Capitol and meet with over 210 congressional offices about the value of the golf industry. It felt so rewarding to meet with Senators and Congressmen that represent our great state and tell them about the many benefits of the over 200 golf facilities in Oklahoma.

![]() |
| Before |
![]() |
| After |
![]() |
| #15 looking at #14 green- before |
![]() |
| After |
![]() |
| #16 tee looking back to #15 |
![]() |
| grass clippings were common this year due to staff shortage |
![]() |
| catching up on bunker details |

Today is the winter solstice which means it is the shortest day of the year and the official start to meteorological winter. Leading up to today, we've had a very mild winter. December has been above average for most of the month and November was also very mild despite getting a little snow on November 12th. Golfers have been blessed with plenty of nice days to get out and enjoy their golf course. It has also been nice for our department. Warm, sunny days are always nice this time of year to be out conducting our work.
With all the nice golfing weather we've been having, the grounds crew has been busy most mornings preparing the golf course for the days rounds. Aside from daily course preparations, the crew renovated the cart path extension left of #12 green (more info found here), applied wetting agent to collars, installed rock to #2 creek, refurbished the clubhouse patio furniture, trimmed trees, and many other miscellaneous activities.
Recently, we also said goodbye to our long-time Assistant Superintendent, Michael Liebe, as he accepted the Superintendent position at South Lakes Golf Course in south Tulsa. Michael has worked by my side for a very long time. He would have had his 10th anniversary this March. For the past 9 years, Michael has been here helping us create stability and routine, renovate and improve, and helped us overcome numerous obstacles along the way. I can say unequivocally, that Michael is a big reason we are who we are today. I am indebted to him for all his years of loyal, dependable service and wish him much success in his new role as Superintendent at South Lakes.
![]() |
| Rough grading the path |
![]() |
| With gravel installed, RR tie curbs are set |
![]() |
| Dirt back fill and sod to tie-in project to adjacent slopes |
![]() |
| Before |
![]() |
| After |