Thursday, October 15, 2015

#5 Greens Surround Drainage

First, the trench is dug out
This week, the grounds staff completed a small drainage project right of #5 green.  This area has been holding excessive amounts of water for most of the season and has become an issue.  The wet turf is very soft and prone to damage from mowers and foot traffic.  Joe, our irrigation technician, installed a small section of drainage pipe, and gravel, to give the excess water in the soil someplace to go.  Over the next few days, this area should start to dry up and should be much drier going forward.

Second, pipe is added 




Third, trench is backfilled with gravel

Lastly, sod is replaced and topdressed smooth