Friday, December 17, 2010

#16 retaining wall project


The project on #16 is right on schedule and is beginning to take it’s basic shape.  Now that the pond bank has been sloped back, JonesPlan will begin to contour the area to match the rolling hills behind the green.  A new smaller bunker will be installed in the same area as the original bunker to maintain the difficulty on the left side of the green.  The area directly in front of the green will be sloped so that it can be maintained at fairway height and will allow golf balls to roll into the pond if left short.