Tuesday, March 6, 2012

Wind


The wind has really kicked up today.  We are seeing sustained winds up to 35 miles per hour with gusts over 45.  Come on out today for a true links golf experience. =)

Tuesday, February 14, 2012

Winter's Back


Well after what has seemed like months of mild weather, we got reminded that it's still winter.  A fresh dusting of a couple of inches is welcome moisture for the golf course.  We thankfully missed the freezing rain that they forecast.  The snow has all melted and we are back open for play today.  Besides some fog and wet conditions, the temperature should be nice later and we hope to see some golfers.  The high for tomorrow is supposed to be almost 60 degrees!  Go figure!

Saturday, February 4, 2012

Mower recycling

Before
After having spent the past couple of growing seasons mowing our 50 acres of rough with one mower.  I began to knock around the idea of putting two rough mowers out there to get it done in half the time, but weren't sure how we were going to make it happen.  We decided to pull our old gang reel unit out from behind the shop.  This mower hadn't been used in years so Mitchell, our equipment technician, got busy grinding reels and checking gear boxes.  Once Mitchell finished with all the repairs, the crew gave it a new coat of black paint.  Another benefit to reviving this old mower, besides efficiency, is that we will be able to reduce the operating hours of our other rough mower.  By keeping the hours down, normal wear and tear will decrease and the mower will last longer.
After

Thursday, February 2, 2012

Driving range drainage project


The Public Works department is planning to install a drainage swale on the west edge of the driving range to protect the houses along that property line from potential flooding.  Over the past couple of weeks they have been surveying, marking the area with grade stakes, and setting silt fencing.  Once the finish grade is done on the swale, new sod will be laid over the entire area.  I will provide updates to this project as they happen.

Driving range divots

Divots are in line, less removal of turf

Divots are scattered, more turf removed
With all the additional play we've been experiencing due to the mild weather, the driving range tee has become pretty beat up.  We still have two more months until spring and I would like to remind everyone about the proper way to take a divot while practicing.  The least disruptive way to take divots is to put the range ball on the back of the previous divot.  This basically limits the amount of turf removed by almost half during each shot.  We effectively end up with long, thin strips of removed turf instead of a large mass of random divots that take much longer to recover.  To the right are two pictures showing the difference between the two techniques.  The agronomy staff hopes that this information will help you to continue to get the most out of your time practicing, while helping us keep the range tee in the best condition possible.  If you have any questions, don't hesitate to ask.

Wednesday, January 18, 2012

Tunnel pump

The crew spent yesterday working on one of the more unglamorous jobs on the course.  The pump for the tunnel needed to be installed.  It had become clogged with silt and was repaired.  Now we needed to clean out the mud and water so we could install the pump.  This is usually a messy process but the guys got it done without a problem.  Now the tunnel is ready for spring and should work like a charm.


Published with Blogger-droid v2.0.3

Thursday, January 12, 2012

Snow


We had our first snow of the season last night.  Although the snow accumulation was pretty puny, at only half an inch, it did bring some much needed moisture.  It's been very dry lately so we'll take whatever we can get.  The next few days look to be pretty cold but the forecast is calling for a warm up after this weekend.

Wednesday, January 11, 2012

Chipping green bunker renovation

The crew wrapped up the chipping green bunker renovation this morning.  We ran through this bunker relatively quickly because we didn't need to redesign anything or move any dirt.  We simply scraped out the old  sand and drainage and replaced it.  Even though the bunker is finished, this green complex will remain closed until the green is ready to be opened.  We are excited to get some good growing weather now, but we still need a few weeks in the spring to finish growing it in.  We appreciate your patience during this time and look forward to having a high quality practice facility this spring.


Fog





We were blessed with some fog this morning and I couldn't wait to get out and shoot some pictures of the course.  Fog is one of my favorite weather events that can happen on the course and always leaves me with some neat visuals.  Here is are a few pictures from this morning.







Monday, January 9, 2012

Wetting agent application


I don't want to jinx us but so far this winter has been very mild and dry.  Looking back on our records, we have only had an inch and a half of precipitation since Thanksgiving.  Winter can often be the driest season of the year, especially if you don't get much snowfall.  Winter dessication, or drying out, is a common issue on bentgrass greens.  In order to keep our greens hydrated, our assistant superintendent, Michael, is applying a wetting agent to the greens today.  Wetting agents work to help the water penetrate the greens surface.  Once through the surface, the product helps the soil retain moisture longer, making it more available for the turf.    

Friday, January 6, 2012

Beautiful weather



















The weather we've been experiencing lately couldn't be better for golf!  We hope that everyone is taking advantage and hitting the links!








Wednesday, December 28, 2011

Vandalism



This morning we realized that we had a little bit of damage caused by a vehicle spinning out on #6 black tee box.  The damage is minor but is another reminder that vandalism is a constant danger, especially with so many holes near neighborhood streets.

Friday, December 23, 2011

Electrical repair

Yesterday the crew installed a section of new irrigation power wire on #6.  This wire supplies power to the satellite box for #6 green.  You've probably noticed the holes we've been digging lately.  We found a short in the wire somewhere between the tee and the green  This about 1,500 feet, so the best way we've found to isolate the problem is to go to the middle, cut and test the wire to see which direction the problem is.  Then we will go to the middle of that section, cut and test again, and so on. Now that we have it narrowed down to about 100 feet, we cut a trench and installed a new piece of wire.  Now that the new wire is installed ,and all the areas we tested have been spliced back together, the area can be cleaned up and finished.

Thursday, December 22, 2011

Misc. sod projects

Cart path by #10 green
cart path behind #18 green
Yesterday afternoon, the crew had some leftover sod and soil from the project on #12 green so we decided to address some low areas along cart paths.  The areas at #10 and #18 green have been on my mind for awhile so we took the opportunity to use the extra materials to fix these areas.  We will continue to address areas throughout the course similar to this as we go through the rest of the off season.

#12 Bunker renovation

#12 bunker before
Yesterday morning the agronomy staff went out to the bunker project on #12 and wrapped up any last minute details that needed to be addressed.  All the sod was rechecked and ground under repair markings have been placed around the work site.  Like similar projects in the past, this new bunker complex will remain closed until spring when the Bermuda greens up and begins to root into the ground.  Until then, please help keep the new bunker complex intact by keeping off unless absolutely necessary.  
#12 bunker after

Tuesday, December 20, 2011

Foggy morning

#14 fairway with light fog
The storm that moved through yesterday ended up not dumping nearly as much rain as was expected.  The rain total for the last 24 hours is just under a quarter inch.  However, this rain was enough to force golf carts back onto cart paths today, due to the moisture that remained from the previous storm.


Monday, December 19, 2011

#12 bunker renovation

The crew is hustling today to get all the sand installed in the two new bunkers on #12 before the rain tonight.  Once all the sand is installed, sod will be placed around the edges and around the basin to protect them from contamination.  The remaining sod will be installed once the sod farm can resume cutting later this week.  This will complete this project.



Tuesday, December 6, 2011

#12 bunker renovation

The crew has begun installing the drainage in the upper bunker today.  This bunker will be ready for sand by the end of the day.  Tomorrow we will focus on digging out the new drainage trenches and installing pipe in the lower bunker.


Thursday, December 1, 2011

Irrigation wire repair

This morning the crew is taking a small break from the work on #12 bunker to replace a section of power wire that feeds the irrigation system on the middle of the course.  This section of wire is damaged and needs to be replaced.  Once this wire is installed, we can restore power to the irrigation control boxes in this area. 


Wednesday, November 30, 2011

#12 bunker renovation

Well after some rain delays and thanksgiving, the crew is back out working on #12 bunker.  Topsoil is being added and tamped to finish forming the back sides of each bunker.  In the photo you can see that we have begun cutting the new lip of the back bunker.  Once the bottom of the bunker is dried out, the inside of the bunker can be tamped so we can begin hand digging the new bunker drainage.


Monday, November 14, 2011

12 bunker

The next step in the renovation is the installation of the drainage.  The drainage that carries the water from the bunker drainage to the creek must be installed before the new drainage inside the bunker can be put in.  Once the pipe is laid, the trenches will be backfilled and the final shaping can be done.   


Thursday, November 10, 2011

#12 bunker renovation

Rough grading has officially begun on the renovation on #12 greenside bunker. The new bunker shape is beginning to emerge.  Similar to the renovation on #8, the square footage is being reduced while keeping the most used portions.  The remaining bunkers are being recontoured and new drainage will be installed.  The part that is being removed will be converted to a grass basin.



Wednesday, November 9, 2011

Chipping green update

The over the last few weeks, the Chipping green has made a lot of progress.  Mild temperatures, heavy rains, and a steady diet of nutrients have really helped this green get back on track.  We will begin lowering the height and topdressing with sand while we are still under good growth conditions.


Carts on path reminder

This morning we received our first groups of play since the rain yesterday, and this is what I saw on #12. 

Please remember to follow all cart rules.  We have them to protect the course from this kind of avoidable damage.  Thank you.


Tuesday, November 8, 2011

Aftermath of rain

Whenever it rains more than an inch, the staff must go out and check drain basins and fix bunkers.  Here is a picture of the guys in action repairing the bunkers on #5 green.  As you can see, the heavy rain eroded the sand exposing the soil underneath.  Silt will wash off this exposed soil and contaminate the bunker over time.


More rain

Well, we're at 3.5 inches and counting.  Looks like we are in for some more before it moves out of the area.  With this much rain, our creeks and tunnel are flooded and we will be closed until they are passable. Today we will be busy getting the course ready for  tomorrow's play.

Monday, November 7, 2011

#2 green update

The agronomy staff has spent the last few days laying sod into the damaged areas on #2.  Today they are down to the smallest areas and should wrap up by the end of the day.  Once our sand pile dries, a heavy application of topdressing will be applied to aid in the establishment smooth the new sod.


Signs of fall

The leaves are really changing and it's looking more and more like fall.  Hopefully winter isn't in a big hurry to get here!


Rain

We came this morning and saw that the system that moved through last night dumped an inch of rain.  We are cart path only today and possibly tomorrow since more rain is expected. 


Friday, October 21, 2011

Tree removal

View from behind #1 green facing west
This week the maintenance staff has been working on removing shade trees from around the greens.  This process has been ongoing since early summer.  As the angle of the sun changes with the seasons, different trees become a problem and must be removed.  Our goal is to have sunlight on the greens as soon as possible in the morning.  A green that has access to sunlight all day is going to be much healthier than one that is shaded until mid morning.  Turf must have sunlight to create energy, so shading a green until late morning is like skipping breakfast everyday.  Also, morning sunlight allows surface moisture to begin evaporating so the green is less susceptible to disease.  Removing these shade trees, coupled with the fans that were purchased, the agronomy staff will be able to replicate the ideal growing conditions that are found on many of the other greens on the course.  This will set us up for long-term success in the future.

Wednesday, October 19, 2011

Chipping green update

It has been almost a full month since seeding and the green is beginning to take shape.  We have been aggressively fertilizing and watering the green to get the seedlings up.  Now that walk mowing has started, we will continue to push the green with fertilizer and increase our mowing frequency.  This will force the plant to grow across the surface more and fill in.  It is going to get cold during the next few days but hopefully the weather remains mild and we can encourage as much growth as possible during the next 4-6 weeks.

Temporary green on #2


As of Monday, the agronomy staff has implemented a temporary green for #2.  The end of the fairway was cut lower and topdressed to give the temporary a smoother roll.  An eight inch cup has also been used to make it more fun to play.
This green experienced extremely high levels of a plant parasite called nematodes.  These nematodes are microscopic and survive in the soil during the growing season.  They extract nutrients from the roots of healthy plants thereby compromising the turfs ability to handle severe stresses such as the intense heat and drought experienced this summer.  We decided that in order to take advantage of the prime growing conditions right now, that we would restrict play on this hole to a temporary green, to give the green a break from all the foot traffic.  This will also allow the agronomy staff more access to the green for repairs.  We are planning on re-opening this green in a couple of weeks once the green fills in and is in acceptable condition.  We apologize for the inconvenience but look forward to the improved conditions on this green.

Saturday, October 1, 2011

Chipping green renovation update

Day 1

Day 7
It's been over a week since we seeded the chipping green and the young seedlings are coming up nicely.  We have been blessed with great weather so the establishment is right on schedule.  Mowing will begin within the next week or so.  Once we are able to mow the green a few times a week, we will begin lightly topdressing the green with sand to smooth out any imperfections that may develop during establishment.