| Punching holes on #3 green |
The next few days will be filled with more rolling, blowing and mowing to get the greens back into the best possible condition by the weekend.
![]() |
| The finished product on #9 green |
The place to get a behind-the-scenes look at grounds maintenance at Bailey Ranch Golf Club
![]() |
| Punching holes on #3 green |
![]() |
| The finished product on #9 green |
been very productive. Since finishing removal of all old sand yesterday, the old drainage material has been removed and additional drainage trenches were dug out. Our assistant superintendent, Michael Liebe, was in the mini excavator knocking down the old bunker edge on the west half that is to be converted to a sod basin. Tomorrow we will finish the grading the soil and get the area ready for sod while simultaneously installing the new drain pipe and gravel in the right side of the bunker. If all goes well, we should be ready for sod and new sand by the end of the week.
After a mild winter, it seems safe to say that spring is here. Nights are warming up, Bermuda is waking up from dormancy, and trees are blooming all over the place. I love this time of year! We have been taking full advantage of the nice weather and the course is as ready as ever for a busy spring season of great golf.
![]() |
| Before |
![]() |
| After |
![]() |
| Divots are in line, less removal of turf |
![]() |
| Divots are scattered, more turf removed |
The crew spent yesterday working on one of the more unglamorous jobs on the course. The pump for the tunnel needed to be installed. It had become clogged with silt and was repaired. Now we needed to clean out the mud and water so we could install the pump. This is usually a messy process but the guys got it done without a problem. Now the tunnel is ready for spring and should work like a charm.
We had our first snow of the season last night. Although the snow accumulation was pretty puny, at only half an inch, it did bring some much needed moisture. It's been very dry lately so we'll take whatever we can get. The next few days look to be pretty cold but the forecast is calling for a warm up after this weekend.
The crew wrapped up the chipping green bunker renovation this morning. We ran through this bunker relatively quickly because we didn't need to redesign anything or move any dirt. We simply scraped out the old sand and drainage and replaced it. Even though the bunker is finished, this green complex will remain closed until the green is ready to be opened. We are excited to get some good growing weather now, but we still need a few weeks in the spring to finish growing it in. We appreciate your patience during this time and look
forward to having a high quality practice facility this spring.![]() |
| Cart path by #10 green |
![]() |
| cart path behind #18 green |
![]() |
| #12 bunker before |
![]() |
| #12 bunker after |
![]() |
| #14 fairway with light fog |
The crew is hustling today to get all the sand installed in the two new bunkers on #12 before the rain tonight. Once all the sand is installed, sod will be placed around the edges and around the basin to protect them from contamination. The remaining sod will be installed once the sod farm can resume cutting later this week. This will complete this project.
The crew has begun installing the drainage in the upper bunker today. This bunker will be ready for sand by the end of the day. Tomorrow we will focus on digging out the new drainage trenches and installing pipe in the lower bunker.
This morning the crew is taking a small break from the work on #12 bunker to replace a section of power wire that feeds the irrigation system on the middle of the course. This section of wire is damaged and needs to be replaced. Once this wire is installed, we can restore power to the irrigation control boxes in this area.
Well after some rain delays and thanksgiving, the crew is back out working on #12 bunker. Topsoil is being added and tamped to finish forming the back sides of each bunker. In the photo you can see that we have begun cutting the new lip of the back bunker. Once the bottom of the bunker is dried out, the inside of the bunker can be tamped so we can begin hand digging the new bunker drainage.
The next step in the renovation is the installation of the drainage. The drainage that carries the water from the bunker drainage to the creek must be installed before the new drainage inside the bunker can be put in. Once the pipe is laid, the trenches will be backfilled and the final shaping can be done.
Rough grading has officially begun on the renovation on #12 greenside bunker. The new bunker shape is beginning to emerge. Similar to the renovation on #8, the square footage is being reduced while keeping the most used portions. The remaining bunkers are being recontoured and new drainage will be installed. The part that is being removed will be converted to a grass basin.
The over the last few weeks, the Chipping green has made a lot of progress. Mild temperatures, heavy rains, and a steady diet of nutrients have really helped this green get back on track. We will begin lowering the height and topdressing with sand while we are still under good growth conditions.
This morning we received our first groups of play since the rain yesterday, and this is what I saw on #12.
Please remember to follow all cart rules. We have them to protect the course from this kind of avoidable damage. Thank you.
Whenever it rains more than an inch, the staff must go out and check drain basins and fix bunkers. Here is a picture of the guys in action repairing the bunkers on #5 green. As you can see, the heavy rain eroded the sand exposing the soil underneath. Silt will wash off this exposed soil and contaminate the bunker over time.